Deprecated: Function set_magic_quotes_runtime() is deprecated in /home/etegroup/public_html/framework/initialize.php on line 20
ETE Group - News Archives
 
 
  ETE has signed 1.2 Billion SAR. JSDP Airport Outfall Project Package -8. End of March 2012 ETE has added another milestone in its continuous growth, ETE has signed a contract for 'Airport Outfall Project for Jeddah Storm Water Drainage Program' consists of 56,000 Linear Meter of RC pipe, predominately 3.5m diameter. ETE is constructing automobile manufacturing plant for ISUZU in Dammam Industrial area-2. Yet again ETE has pioneered in catering manufacturing industry needs, by signing a contract with ISUZU, as a general contractor. ISUZU has aimed to produce 25,000 transporting trucks annually. The General Manager of ETE Group 'Engr. Sinan Bu Khamsin' has signed the contract with ISUZU & MODON. From MODON the Hon'ble Minister of Commerce and Industry 'Dr. Tawfiq Al-Rabiah' has signed the contract.
 
 
Home Page Profile Vision Mission Our Companies News Archives Webmail
 
 

News Archives

 

TABALSA ARABIA INAUGURATION PARTY

Posted by Administrator (admin) on 12/02/2011
News Archives >>

The much anticipated inauguration party for Tabalsa Arabia Factory which was held at the Le Meridien Hotel- Al Khobar on the 19th Dec., 09, has successfully ended with high level of optimism as the business officially kicks off. The main event however was preceded by series of activities during the day, where the Spanish delegation team from Grupo Tabalsa ( GTI ) were taken to the factory site at Dammam Second Industrial Area accompanied by Eng. Morhaf Bu-Khamsin ( VP for Business Development –ETE Group ) and Eng. Ahmed Bu-Khamsin ( VP for Operations –ETE Group ). The Spanish team who are members of the top management themselves were very much impressed upon seeing the whole physical structure of the factory in its best shape, as what has been highly expected for. Thereafter, they were taken to the production area to witness the actual production flow of EMT ( Electric Metallic Tube ) -that made them delighted as the process went on smoothly. EMT is being used in construction industry in various applications, the most popular of which are for insulating system, water proofing, and electrical cabling.

At 8 pm of the same day, a formal Inauguration Party followed at the Al Dana Banquet Hall of Le Meridien Hotel in Al Khobar. Tabalsa Arabia have invited more guests to grace this occasion. They have come from different sectors of the business society such as; construction, bankers, financiers, and even suppliers of the same products who are considered to be direct competitors. They were warmly welcomed by Eng. Morhaf Bu-Khamsin, who delivered the much applauded welcome speech. The event’s highlights immediately followed as scheduled i.e. company presentation and overview by both partners ( ETE Group & Grupo Tabalsa), and product presentation which was conducted by Mr. Mohammed Fayez ( Sales and Marketing Manager-Tabalsa Arabia ). The said presentations had given Tabalsa Arabia the opportunity to brief the audience about the newly formed joint-ventured company while giving bits of technical knowledge and insights regarding its products and services.

The Inauguration Party was concluded by exchange of personal greetings and closer interactions between business people who were present that night while indulging themselves into a sumptuous dinner, turning the atmosphere into more friendly and relaxed. By and large, the 1-day event which aimed at launching the products, creating market awareness and most especially building business relationships, was truly a great success.

Last changed: 12/02/2011 at 3:18 AM

Back

 


 
     
     
Search
   Feedback    Contact Us
   Latest ETE Group News