Deprecated: Function set_magic_quotes_runtime() is deprecated in /home/etegroup/public_html/framework/initialize.php on line 20
ETE Group - Precast Concrete
 
 
  ETE has signed 1.2 Billion SAR. JSDP Airport Outfall Project Package -8. End of March 2012 ETE has added another milestone in its continuous growth, ETE has signed a contract for 'Airport Outfall Project for Jeddah Storm Water Drainage Program' consists of 56,000 Linear Meter of RC pipe, predominately 3.5m diameter. ETE is constructing automobile manufacturing plant for ISUZU in Dammam Industrial area-2. Yet again ETE has pioneered in catering manufacturing industry needs, by signing a contract with ISUZU, as a general contractor. ISUZU has aimed to produce 25,000 transporting trucks annually. The General Manager of ETE Group 'Engr. Sinan Bu Khamsin' has signed the contract with ISUZU & MODON. From MODON the Hon'ble Minister of Commerce and Industry 'Dr. Tawfiq Al-Rabiah' has signed the contract.
 
 
 
  Click HERE to go to the main page

 


 
     
     
Search
   Feedback    Contact Us
   Latest ETE Group News