Deprecated: Function set_magic_quotes_runtime() is deprecated in /home/etegroup/public_html/framework/initialize.php on line 20
ETE Group - News Archives
 
 
  ETE has signed 1.2 Billion SAR. JSDP Airport Outfall Project Package -8. End of March 2012 ETE has added another milestone in its continuous growth, ETE has signed a contract for 'Airport Outfall Project for Jeddah Storm Water Drainage Program' consists of 56,000 Linear Meter of RC pipe, predominately 3.5m diameter. ETE is constructing automobile manufacturing plant for ISUZU in Dammam Industrial area-2. Yet again ETE has pioneered in catering manufacturing industry needs, by signing a contract with ISUZU, as a general contractor. ISUZU has aimed to produce 25,000 transporting trucks annually. The General Manager of ETE Group 'Engr. Sinan Bu Khamsin' has signed the contract with ISUZU & MODON. From MODON the Hon'ble Minister of Commerce and Industry 'Dr. Tawfiq Al-Rabiah' has signed the contract.
 
 
Home Page Profile Vision Mission Our Companies News Archives Webmail
 
 

News Archives

 

NEW PLANT TO OPEN at KING ABDULLAH ECONOMIC CITY ( KAEC )

Posted by Administrator (admin) on 12/02/2011
News Archives >>

ETE Ready Mix is set to open another modern batching plant facilities by end of this month at the notorious King Abdullah Economic City ( KAEC ), adding another station to its roster of batch plant stations that are strategically located in the kingdom.

KAEC, which is touted as the new economic hub, will soon rise approximately 1000km north of Jeddah. In order to meet the highest level of standards for the said project, ETE will optimize the quality of its products and services by operating it with state-of-the-art facilities, equipped with computer automation system, modern transportation fleet and manned by highly qualified workforce.
 

Last changed: 12/02/2011 at 3:11 AM

Back

 


 
     
     
Search
   Feedback    Contact Us
   Latest ETE Group News