Water Injection Pump
Station Facilities




Expansion of existing Water Injection Pump Stations at Uthmaniyah and Haradh, For SAUDI ARAMCO under SNC LAVLIN & SAIPEM Joint Venture. As part of Saudi Aramco's Khurais program.

image01

Isuzu Knock-Down Factory


The Factory is planned to produce 600 medium duty trucks a year and in future Isuzu plans to boost the plant's annual production to 25,000 units inlcluding light and heavy duty trucks.

image01

Ma'aden Phosphate Plant


Ma'aden Phosphate Plant has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back to back to basics.

image01

Arar Substation


A SECO project, of 'Eastern Operating Area' Al Oasis has participated as main contractor where as our scope is included but not limited to complete Civil and Mechanical side.

image01

Jubail Substation


Construction of Substations 230 Kv & 115 Kv, GIS Buildings and 34.5 Kv Switchgear building, control building and complete civil, small power and mechanical works and site development works.

image01

Jeddah Stormwater
Drainage Project (JSDP)



This Mega project was conceived to control and direct the stormwater towards the sea. The whole project consists of 8 packages with 5 Dams and 3 Channels/Drainage and outfalls.

image01

Karan Gas Facilities


ETE takes pride to be a part of this project as a Subcontractor to HDEC to construct the TRAIN Substations, PIB's (Process Interface Building), Communication & Sunshade Buildings, Analyser & Car parking shelter, OME Bldg, Musalla Building snd Smoking Shelter & Civil works for pipe racks and miscellaneous foundation.

image01

Manifa Core Hydrocarbon
Facilities


Saudi ARAMCO has awarded Snamprogetti the 'Lump Sum Turnkey' project for package No-1 of Manifa Core Hydrocarbon Facilities, in the frame of Manifa Field Development program to increase the production capacity of the Kingdom of Saudi Arabia, by 900,000 barrels per day. Manifa is located 200 km north of Dhahran City, Saudi Arabia.

image01

Projects

WATER INJECTION PUMP STATION

WATER INJECTION PUMP STATIONS AT UTHMANIYAH & HARADH

Expansion of existing Water Injection Pump Stations at Uthmaniyah and Haradh, for SAUDI ARAMCO under SNC LAVLIN & SAIPEM Joint Venture. As part of Saudi Aramco's khurais program.

KEY FEATURES OF THE PROJECT

Construction work package, civil works, Building works, structural, architectural, Electrical, Instrumentation, Communication, HVAC, Plumbing, Construction of Control Building, Substation, Co2 & Battery Building, Precast, Pipe Rack Foundation, Pipe Supports, Transformer / GT / KO Drum / Tank foundation, Asphalt, Electro-mechanical works, sanitary, Sewage, Electrical / Instrumentation.

Complete Civil and Building works for Control Building, Substation, Support Building, Battery Buildings, Guard House and Sunshade.

Civil works for CGT foundations, pipe sleeper ways, MOV foundations, Sewer manholes, Valve boxes, Electrical maholes and Telecom manholes.

RTR Pipe fabrication, installation and hydro testing for oily water line, fire water and drainage line.

Structural steel works for pipe racks, pipe supports, cable racks, manifolds and for other equipment structures.

Complete finishing works for Control Building, using Composite Aluminum cladding and stainless steel facade canopy.

Procurement, Installation, Testing & Commissioning of Electrical Power & Lighting works inside building and area lighting.

Supply, Installation, Testing & Commissioning of low current works inside and outside the building which includes Fire and Gas detection system including, PA / GA systems and CCTV system.

Procurement, Installation, Testing & Commissioning of HVAC works which includes ducting, AHUS, ACCUS, Fire dampers Smoke Dampers, Volume Dampers.

Laboratory equipments including Fume Hoods.

PROJECT'S TITLE :

WATER INJECTION PUMP STATION FACILITIES PROJECT (WIPS)

CLIENT :

SAUDI ARAMCO / SNC LAVLIN & SAIPEM

TIME FRAME :

DECEMBER 16, 2006 - AUGUST 31, 2008

LOCATION OF PROJECT :

UTHMANIYAH & HARADH, K.S.A.