Water Injection Pump
Station Facilities




Expansion of existing Water Injection Pump Stations at Uthmaniyah and Haradh, For SAUDI ARAMCO under SNC LAVLIN & SAIPEM Joint Venture. As part of Saudi Aramco's Khurais program.

image01

Isuzu Knock-Down Factory


The Factory is planned to produce 600 medium duty trucks a year and in future Isuzu plans to boost the plant's annual production to 25,000 units inlcluding light and heavy duty trucks.

image01

Ma'aden Phosphate Plant


Ma'aden Phosphate Plant has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back to back to basics.

image01

Arar Substation


A SECO project, of 'Eastern Operating Area' Al Oasis has participated as main contractor where as our scope is included but not limited to complete Civil and Mechanical side.

image01

Jubail Substation


Construction of Substations 230 Kv & 115 Kv, GIS Buildings and 34.5 Kv Switchgear building, control building and complete civil, small power and mechanical works and site development works.

image01

Jeddah Stormwater
Drainage Project (JSDP)



This Mega project was conceived to control and direct the stormwater towards the sea. The whole project consists of 8 packages with 5 Dams and 3 Channels/Drainage and outfalls.

image01

Karan Gas Facilities


ETE takes pride to be a part of this project as a Subcontractor to HDEC to construct the TRAIN Substations, PIB's (Process Interface Building), Communication & Sunshade Buildings, Analyser & Car parking shelter, OME Bldg, Musalla Building snd Smoking Shelter & Civil works for pipe racks and miscellaneous foundation.

image01

Manifa Core Hydrocarbon
Facilities


Saudi ARAMCO has awarded Snamprogetti the 'Lump Sum Turnkey' project for package No-1 of Manifa Core Hydrocarbon Facilities, in the frame of Manifa Field Development program to increase the production capacity of the Kingdom of Saudi Arabia, by 900,000 barrels per day. Manifa is located 200 km north of Dhahran City, Saudi Arabia.

image01

Projects

FUTURE CERAMIC - 2

CONSTRUCTION OF CERAMIC & PORCELAIN FACTORY AND WAREHOUSE & WORKSHOP FACILITIES

?

Construction of Future Ceramic's factory of, covering built-up space of 80,000 m2 . This project consists of 26,000 m2 of a ceramic factory, 32,000 m2?of porcelain factory and warehouse and workshop facilities of 22,000 m2.

?

KEY FEATURES OF THE PROJECT

?

Our works include construction of all the factory buildings and warehouse facilities, all equipment foundations, installation of machineries, silos kiln and other equipment foundations other than the construction of all the facilities.

?

? Perimeter fencing of precast construction of app 2.8 km long.

? Construction of ceramic factory of 26,000 m2 by pre eng building.

? Construction of porcelain factory of 32,000 m2 by pre eng building.

? Construction of warehouse of 22,000 m2 by pre eng building.

? Equipment foundations for press, spray dryer, kiln, tanks, trenches and supports for entire production line.

? Total architectural finishing works for factories, storages, offices and administrative buildings by epoxy coatings, ceramics tiles, toilets, gypsum ceilings and partitioning, self leveling epoxy, expansion joints, construction and control joints etc.

? Construction of Diesel generator building.

? Construction of 5 nos of precast guard houses.

? Construction of all unity tanks such as fire water tank, domestic water tank, septic tank etc.

? Construction of SEC room, switch gear room.

?

PROJECT'S TITLE :?

CONSTRUCTION FUTURE CERAMIC & PORCELAIN FACTORY

?

CLIENT :?

FUTURE CERAMIC

?

TIME FRAME :?

MAY 25, 2008 - JANUARY 25, 2009

?

LOCATION OF PROJECT :?

2ND INDUSTRIAL ESTATE, DAMMAM, K.S.A.