Water Injection Pump
Station Facilities




Expansion of existing Water Injection Pump Stations at Uthmaniyah and Haradh, For SAUDI ARAMCO under SNC LAVLIN & SAIPEM Joint Venture. As part of Saudi Aramco's Khurais program.

image01

Isuzu Knock-Down Factory


The Factory is planned to produce 600 medium duty trucks a year and in future Isuzu plans to boost the plant's annual production to 25,000 units inlcluding light and heavy duty trucks.

image01

Ma'aden Phosphate Plant


Ma'aden Phosphate Plant has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back to back to basics.

image01

Arar Substation


A SECO project, of 'Eastern Operating Area' Al Oasis has participated as main contractor where as our scope is included but not limited to complete Civil and Mechanical side.

image01

Jubail Substation


Construction of Substations 230 Kv & 115 Kv, GIS Buildings and 34.5 Kv Switchgear building, control building and complete civil, small power and mechanical works and site development works.

image01

Jeddah Stormwater
Drainage Project (JSDP)



This Mega project was conceived to control and direct the stormwater towards the sea. The whole project consists of 8 packages with 5 Dams and 3 Channels/Drainage and outfalls.

image01

Karan Gas Facilities


ETE takes pride to be a part of this project as a Subcontractor to HDEC to construct the TRAIN Substations, PIB's (Process Interface Building), Communication & Sunshade Buildings, Analyser & Car parking shelter, OME Bldg, Musalla Building snd Smoking Shelter & Civil works for pipe racks and miscellaneous foundation.

image01

Manifa Core Hydrocarbon
Facilities


Saudi ARAMCO has awarded Snamprogetti the 'Lump Sum Turnkey' project for package No-1 of Manifa Core Hydrocarbon Facilities, in the frame of Manifa Field Development program to increase the production capacity of the Kingdom of Saudi Arabia, by 900,000 barrels per day. Manifa is located 200 km north of Dhahran City, Saudi Arabia.

image01

Projects

AL JALAMID POWER PLANT

CIVIL, STRUCTURAL, ARCHITECTURAL, ELECTRICAL AND MECHANICAL WORKS AT AL JALAMID POWER PLANT

A MA'ADEN's project to construct a world class Power Plant for MA'ADEN's phosphate mines development area. Worley Parsons being consultant of the project.

KEY FEATURES OF THE PROJECT

Construction of Electrical and control Buildings

Gas turbine foundations

Foundations of substations

Construction of Water Tanks and Fuel tanks

Complete Boundary , fencing

Earth works, Asphalt works

Outdoor foundations, Lighting poles

Station service Transformer foundation

Power transformers foundations

Fire wall power TRAFO / STAN SERV Transfromers

Plumbing and Sanitation

Water Oil Tank / Under Ground Septic Tank

Duct bank, cable trenches

Pit seepage, Dry pit

Stack foundations, tank foundations, fin fan cooler fdn, air filter duct and air filter house and dyke walls etc.

All related Finishing, plumbing and small power works

PROJECT'S TITLE :

AL JALAMID POWER PLANT

CLIENT :

MA'ADEN / HYUNDAI ENGINEERING & CONST CO.

TIME FRAME :

AUGUST 10, 2008 - JULY 10, 2009

LOCATION OF PROJECT :

JALAMID, K.S.A.