Water Injection Pump
Station Facilities




Expansion of existing Water Injection Pump Stations at Uthmaniyah and Haradh, For SAUDI ARAMCO under SNC LAVLIN & SAIPEM Joint Venture. As part of Saudi Aramco's Khurais program.

image01

Isuzu Knock-Down Factory


The Factory is planned to produce 600 medium duty trucks a year and in future Isuzu plans to boost the plant's annual production to 25,000 units inlcluding light and heavy duty trucks.

image01

Ma'aden Phosphate Plant


Ma'aden Phosphate Plant has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back to back to basics.

image01

Arar Substation


A SECO project, of 'Eastern Operating Area' Al Oasis has participated as main contractor where as our scope is included but not limited to complete Civil and Mechanical side.

image01

Jubail Substation


Construction of Substations 230 Kv & 115 Kv, GIS Buildings and 34.5 Kv Switchgear building, control building and complete civil, small power and mechanical works and site development works.

image01

Jeddah Stormwater
Drainage Project (JSDP)



This Mega project was conceived to control and direct the stormwater towards the sea. The whole project consists of 8 packages with 5 Dams and 3 Channels/Drainage and outfalls.

image01

Karan Gas Facilities


ETE takes pride to be a part of this project as a Subcontractor to HDEC to construct the TRAIN Substations, PIB's (Process Interface Building), Communication & Sunshade Buildings, Analyser & Car parking shelter, OME Bldg, Musalla Building snd Smoking Shelter & Civil works for pipe racks and miscellaneous foundation.

image01

Manifa Core Hydrocarbon
Facilities


Saudi ARAMCO has awarded Snamprogetti the 'Lump Sum Turnkey' project for package No-1 of Manifa Core Hydrocarbon Facilities, in the frame of Manifa Field Development program to increase the production capacity of the Kingdom of Saudi Arabia, by 900,000 barrels per day. Manifa is located 200 km north of Dhahran City, Saudi Arabia.

image01

Projects

King Abdullah University of Science and Technology (KAUST) - 2

CONSTRUCTION OF WORLD CLASS RESIDENTIAL VILLAS

?

Worked as an emergency contactor to complete the 98 no. of world class residential villas at town center in 4 zones. Each building has an average floor area of 600 m2, combination of 2-Storey and 3-storey buildings.

?

? Complete building works and architectural finishing for all buildings

? Balance all the site development works for villas to be ready prior to the inaugural ceremony.

? Complete flooring works with marble, granite, ceramics, mosaic, terrazzo and vinyl sheeting etc.

? All the toilet fixtures, kitchen counter top, cabinets and accessories

? Wall tiling and painting.

? Doors and windows installation

? Water proofing works.

? Iron works, handrails and grills.

? Complete HVAC equipment installations, ducting installation and air distribution accessories.

? Complete plumbing works

? Complete electrical works, Electrical lighting installations, electrical fixtures installations.

? Complete fire detection and alarm system

?

KEY FEATURES OF THE PROJECT

?

? ZONE A - 36 BUILDINGS

? ZONE B - 18 BUILDINGS

? ZONE C - 16 BUILDINGS

? ZONE E - 18 BUILDINGS

?

PROJECT'S TITLE :?

KAUST - TOWN CENTER VILLAS

?

CLIENT :?

KAUST ( King Abdullah University of Science and Technology )

?

TIME FRAME :?

JUNE 2009 - FEBRUARY 2010

?

LOCATION OF PROJECT :?

AL THUWAL, K.S.A.