Water Injection Pump
Station Facilities




Expansion of existing Water Injection Pump Stations at Uthmaniyah and Haradh, For SAUDI ARAMCO under SNC LAVLIN & SAIPEM Joint Venture. As part of Saudi Aramco's Khurais program.

image01

Isuzu Knock-Down Factory


The Factory is planned to produce 600 medium duty trucks a year and in future Isuzu plans to boost the plant's annual production to 25,000 units inlcluding light and heavy duty trucks.

image01

Ma'aden Phosphate Plant


Ma'aden Phosphate Plant has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back to back to basics.

image01

Arar Substation


A SECO project, of 'Eastern Operating Area' Al Oasis has participated as main contractor where as our scope is included but not limited to complete Civil and Mechanical side.

image01

Jubail Substation


Construction of Substations 230 Kv & 115 Kv, GIS Buildings and 34.5 Kv Switchgear building, control building and complete civil, small power and mechanical works and site development works.

image01

Jeddah Stormwater
Drainage Project (JSDP)



This Mega project was conceived to control and direct the stormwater towards the sea. The whole project consists of 8 packages with 5 Dams and 3 Channels/Drainage and outfalls.

image01

Karan Gas Facilities


ETE takes pride to be a part of this project as a Subcontractor to HDEC to construct the TRAIN Substations, PIB's (Process Interface Building), Communication & Sunshade Buildings, Analyser & Car parking shelter, OME Bldg, Musalla Building snd Smoking Shelter & Civil works for pipe racks and miscellaneous foundation.

image01

Manifa Core Hydrocarbon
Facilities


Saudi ARAMCO has awarded Snamprogetti the 'Lump Sum Turnkey' project for package No-1 of Manifa Core Hydrocarbon Facilities, in the frame of Manifa Field Development program to increase the production capacity of the Kingdom of Saudi Arabia, by 900,000 barrels per day. Manifa is located 200 km north of Dhahran City, Saudi Arabia.

image01

Projects

KARAN GAS FACILITIES

CONSTRUCTION OF 4 SUBSTATIONS & 3 PIBs (BLAST RESISTANT), OME AND OTHER 19 NO OF ASSOCIATED BUILDINGS

?


HDEC as the main contractor will build gas processing trains consisting of gas handling, gas sweetening, acid gas enrichment, ?gas dehydration and supplementary propane refrigaeration. There package will also inlcude the inlet and utilities facilities to support each processing gas train.

?

ETE takes pride to be a part of this project as a Subcontractor to HDEC to construct the TRAIN Substations, PIB's ( Process Interface building ), Communication & Sunshade Buildings, Analyser & Car Parking shelter, OME Building, Musalla Building and Smoking Shelter & Civil works for pipe racks and miscellaneous foundation.

?

Key Features of the Project

?

??Complete Civil & Vuilding works including but not limited to 4 Blast Resistant Substations using precast wall panels and double tee slabs, 3 Blast Resistant Process Interface Buildings, OME Building, EDG Building using "Cast In Situ Monolithic Construction".

? Civil works for pipe rack foundations, pipe supports, and all related equipment foundations.

? RTR works for firefighting lines

? Communication & Sunshade Building

? Complete finishing works for the buildings, procurements, installation, testing & commissioning of electrical power & lighting works inside building

? BLAST RESISTANT BUILDINGS: PIB 254, PIB 255, PIB 256, PIB 253.

? Process Train 1 : Substation 244, PIB 254, Communication & Sunshade Bldg. 1, Analyzer & Car Parking Shelter 1

? Process Train 2 : Substation 245, PIB 255, Communication & Sunshade Bldg. 2, Emergency Diesel Generator Bldg., Analyzer & Car Parking Shelter 2

? Process Train 3 : Substation 246, PIB 256, Communication & Sunshade Bldg. 3, Analyzer & Car Parking Shelter 3

? Miscellaneous Facilities?

? Operation Maintenance Building, Musalla Bldg, Smoking Shelter, Car Parking Shelter 5, Sewer & Drainage System.

?

PROJECT'S TITLE :

KARAN GAS FACILITIES

?

CLIENT :

ARAMCO & HYUNDAI ENGINEERING

?

TIME FRAME :

NOVEMBER 26, 2009 - JANUARY 20, 2012

?

LOCATION OF PROJECT :?

KHURSANIYAH, K.S.A.