JUBAIL EXPORT REFINERY
CONSTRUCTION OF SUBSTATION BUILDINGS, PROCESS INTERFACE BUILDINGS, RTR AND CIVIL WORKS
?
Petrol Steel as a main contractor for Jubail-2 Export Refinery Project for the client SATORP has awarded the complete Civil work contract encompassing EPC ( Engineering, Procurement and Construction) of substations and PIBs.
?
Key Features of the Project
?
??Construction of 4 substation buildings with cable basements and transformer yard and 3 Process-interface Building (PIB) within the JERP package-6, North Tank Farm and South Tank farm. These buildings are Blast Resistant buildings since it is located within the Refinery tank farm. These buildings were constructed using monolithic type of xast-in-place construction with external components like Blast Resistant doors and Blast Valves.
?
? The entire substations are included but not limited to high roof elevations such as 9.5 m high concrete walls and roof, all the related civil, architectural, structural, electrical and mechanical works.
?
? Construction of Transformer bays with fire walls in between them at every substations
?
? Installation, Testing, Commissioning of Electrical Power, Lighting works inside building, Instrumentation works.
?
? RTR works including fabrication of spools, installation, testing and commissioning from 1" to 40 " diameters for sewer, Water and fire water systems for North and South Tank form areas.
?
? Site development works, Asphalt works, Walk ways and landscaping for all 4 locations.
?
PROJECT'S TITLE :
JUBAIL EXPORT REFINERY PROJECT - PACKAGE - 6 (SATORP)
?
CLIENT :
SATORP - SAUDI ARAMCO & TOTAL REFINERY PROJECT
?
TIME FRAME :?
JULY 31, 2010 - JULY 31, 2011
?
LOCATION OF PROJECT :?
JUBAIL, K.S.A.