MANIFA CORE HYDROCARBON FACILITIES 2
EXECUTION OF ELECTRICAL, INSTRUMENTATION WORKS & COMMUNICATION WORKS RELATED TO THE MANIFA PROGRAM PACKAGE - 1
?
Saudi ARAMCO has awarded Snamprogetti the 'Lump sum Turnkey' project for package No-1 of Manifa Core Hydrocarbon Facilities, in the frame of Manifa Field Development program to increase the production capacity of the Kingdom of Saudi Arabia, by 900,000 barrels per day. Manifa is located 200 km north of Dharhan city, Saudi Arabia.
?
Key Features of the Project
?
? Complete grounding works
? Cable trays, conduits and cable ladders for entire main pipe rack, flare and KO drum area
? installation and termination of various size of cables direct buried, through conduits, through duct banks and above the cable racks.
? Installation of air insulation bus ducts, push buttons, power sockets, housings for terminal 4 blocks/apparatus, PBs Junction boxes, transformers, Anodes, flood lights, lighting poles etc.
? Installation of cable tray from size 200 mm to 900 mm, flare K.O. drum and flare area, cable pulling and Termination.
? Lighting pole installation from 3 m ro 12 m height.
? Field calibration of various instruments, sanction program as per hook up drawings, Instrument location marking as per P & ID. JB installation.
? Instruments installations and terminations such as pressure transmitters, recorder, controllers for take off valves, Ultrasonic radar, microwave level transmitter, magnetic of reinforced glass level ?indicators, thermo well, electric indicator, solenoid valves, temperature gauge, diffusion type gas detectors, fire and gas audible and visual alarm etc.
? installation of telecommunications housings, accessories, tubing, public address system, radio, CCTv power line carrier, information display and security / Access control systems installation of closed circuit TV appliances etc including all cables, conduits, trays etc.
?
PROJECT'S TITLE :
MANIFA PROGRAM PACKAGE - 1 CORE HYDRO CARBON FACILITIES E& I WORKS
?
CLIENT?:
SAUDI ARAMCO / SNAMPROGETTI SAUDI ARABIA
?
TIME FRAME :
MARCH 5, 2011 - AUGUST 30, 2012
?
LOCATION OF PROJECT :?
MANIFA, K.S.A.