Water Injection Pump
Station Facilities




Expansion of existing Water Injection Pump Stations at Uthmaniyah and Haradh, For SAUDI ARAMCO under SNC LAVLIN & SAIPEM Joint Venture. As part of Saudi Aramco's Khurais program.

image01

Isuzu Knock-Down Factory


The Factory is planned to produce 600 medium duty trucks a year and in future Isuzu plans to boost the plant's annual production to 25,000 units inlcluding light and heavy duty trucks.

image01

Ma'aden Phosphate Plant


Ma'aden Phosphate Plant has awarded this contract to "Mohammad Al-Mojil Group" which in turn has requested ETE to perform the complete work on back to back to basics.

image01

Arar Substation


A SECO project, of 'Eastern Operating Area' Al Oasis has participated as main contractor where as our scope is included but not limited to complete Civil and Mechanical side.

image01

Jubail Substation


Construction of Substations 230 Kv & 115 Kv, GIS Buildings and 34.5 Kv Switchgear building, control building and complete civil, small power and mechanical works and site development works.

image01

Jeddah Stormwater
Drainage Project (JSDP)



This Mega project was conceived to control and direct the stormwater towards the sea. The whole project consists of 8 packages with 5 Dams and 3 Channels/Drainage and outfalls.

image01

Karan Gas Facilities


ETE takes pride to be a part of this project as a Subcontractor to HDEC to construct the TRAIN Substations, PIB's (Process Interface Building), Communication & Sunshade Buildings, Analyser & Car parking shelter, OME Bldg, Musalla Building snd Smoking Shelter & Civil works for pipe racks and miscellaneous foundation.

image01

Manifa Core Hydrocarbon
Facilities


Saudi ARAMCO has awarded Snamprogetti the 'Lump Sum Turnkey' project for package No-1 of Manifa Core Hydrocarbon Facilities, in the frame of Manifa Field Development program to increase the production capacity of the Kingdom of Saudi Arabia, by 900,000 barrels per day. Manifa is located 200 km north of Dhahran City, Saudi Arabia.

image01

Projects

RABIGH RP-2 CIVIL WORKS

RABIGH II REFINING AND PETROCHEMICAL

?

PETRO RABIGH facilities are located 150 km north of Jeddah City at the shore od Red Sea on highway proceeding to YANBU and 60 km from King Abdulla University Complex THUWAL.

?

Rabigh II development will include a new aromatics complex and an expanded facility to process 30 million standard cubic feet per day of ethane and approximately 3 million tons per year of naphtha as feedstock to produce a variety of high value-added petrochemical products.

?

Snamprogetti saudi Arabia ( the Main Contractor) subcontracted the Civil, Underground piping and Earthing Works to Eastern Trading & Cont. Est. (ETE) ro execute the Construction activities for these scope of works for the RP-2 Naphta and Aromatics.?

?

Key Features of the Project

?

??Earthworks

??Concrete Paving

? Foundations for machineries and all equipments

? Foundations for steel structures and all piperack

? Concrete culverts

? Sleeper-ways

? Fire proofing for steel pipe racks, steel structures and equipments support

? RTR piping for Oily, fire fighting, chemical, non-oily, sanitary, rain, sewer system

? Underground networks for electric and instrumentation cable

? Manholes, ditches, pits, basins, sumps, and catch-basins

? Surface Drainage

? Asphalt paving

?

PROJECT'S TITLE :?

RABIGH II REFINING AND PETROCHEMICAL PROJECT NAPHTA AND AROMATICS RP2

?

CLIENT :?

ARAMCO OVERSEAS CO. & SUMITOMO CHEMICAL CO. LTD.

?

TIME FRAME :

MAY 2013 TO JUNE 2015

?

LOCATION OF PROJECT :?

JEDDAH CITY, K.S.A.

?